Roadridge Developers Pvt. Ltd. · Guwahati, Assam

Building where roads end.

Roads, highways and bridges across the hills of North-East India — for NHIDCL, PWD and the Border Roads Organisation — since 2008, with Sunshine Overseas since 1994.

0₹ crore turnover, FY22–FY26 (group)
0₹ crore — largest live package (NH-6 Pkg-8)
0road & bridge projects delivered or in hand
0steel & RCC bridges, 48–75 m spans
0+owned plant & machinery units
0states — Assam, Mizoram, Manipur, Arunachal, Nagaland
The film

Seventy-five seconds in the North-East

Our sites, our machines and our bridges — from Sairang to the Tiau river.

Footprint

Where we have built

Tap a pin for the project, client and value. Head office in Guwahati; works spread across Mizoram, Manipur, Arunachal Pradesh and Nagaland.

Ongoing road packageCompleted roadBridgeHead office
Ongoing

Two four-laning packages on NH-6, Mizoram

Both under NHIDCL Kolasib, executed EPC on a back-to-back basis.

NH-6 · Package 8

Four-laning of Mualkhang – Sairang section

Back-to-back subcontract from Dhatarwal Construction Company Pvt. Ltd., Bhiwani.

ClientNHIDCL, Kolasib
Value₹ 338.11 Cr
Appointed01 Nov 2025
Scheduled completion01 Nov 2028
Financial progress 13.55 %
NH-306 & NH-6 · Package 4

Four-laning of Chhimluang – Kolasib section

Existing km 59+700 to 86+000 (design km 61+000–77+500), Silchar–Vairengte–Sairang road, Bharatmala Pariyojana. Back-to-back from Shiwalay Infra Projects Pvt. Ltd., Vadodara.

ClientNHIDCL, Kolasib
ModeEPC
Length16.5 km (design)
StatusIn progress
Site pulse

Latest from the field — voice notes, structured within a minute

  • No updates yet. Send a WhatsApp voice note from site, or tap “Record a site update”.
Updates are read from voice notes by PlusBrains · PB can make mistakes — please double-check quantities before billing.
Completed roads

Delivered, in the hardest terrain in India

ProjectClientScopeValueTimeline
Champhai – Zokhawthar Road
Mizoram · km 0.00 – 27.25
Chief Engineer Roads, PWD Mizoram, AizawlImprovement & upgradation to 2-lane NH standard₹ 170.70 Cr21 Aug 2015 → 30 Apr 2021
Tamenglong – Mahur Road, Pkg-4
NH-137, Manipur · km 43.480 near Azuram, 10.7 km
NHIDCL, TamenglongTwo-lane road with paved shoulders₹ 119.74 Cr21 Oct 2021 → 24 Mar 2025
Tamenglong – Mahur Road, Pkg-1
NH-137, Manipur · km 0.000 – 10.000
NHIDCL, TamenglongTwo-lane road with paved shoulders₹ 111.80 Cr21 Oct 2021 → 10 Jan 2025
Hnahlan – Hmunhlui – Tuimang – Singngei Road
Mizoram · Hnahlan to River Tiau section
PWD, MizoramImprovement & upgradation₹ 32.37 Cr24 Jun 2021 → 31 Dec 2025
Bridges

Five spans, four rivers, three states

Design, drawing and construction of steel-girder and RCC T-beam bridges for the Border Roads Organisation and PWD Mizoram.

2020 → 2024 · ₹ 12.74 Cr

75 m span steel bridge — Arunachal Pradesh

BRO, Project Vartak. Design, drawing & construction of major permanent bridge Amartala-I with steel structure and approach roads.

2020 → 2024 · ₹ 14.97 Cr

70 m span steel bridge — Arunachal Pradesh

BRO, Project Vartak. Design, drawing & construction of major permanent steel bridge, Notchugu.

2023 · ₹ 4.32 Cr

55.9 m span steel bridge — Nagaland

BRO, Project Sewak. Steel superstructure bridge over Paghla Nallah.

2017 → 2019 · ₹ 6.71 Cr

55 m steel-girder bridge over River Tuivawl — Mizoram

PWD, Kolasib Division. Double-lane steel girder bridge.

2016 → 2020 · ₹ 8.99 Cr

48 m RCC T-beam bridge over River Serlui — Mizoram

PWD, Saitual Division. RCC T-beam girder bridge.

Steel truss bridge at inauguration
What we do

Six capabilities, one crew

Plant & machinery

Owned, not hired

Over two hundred units of plant on our books — the reason we can mobilise in weeks where others wait for a season.

Idle iron

What a quiet yard costs

Owned plant earns only when it moves. Slide the share of the fleet standing idle this month and see the hire-equivalent value lost — the number PlusBrains’ plant tracking is built to bring down.

Indicative monthly hire-equivalent rates (edit)
Rates are indicative dry-hire equivalents for the North-East, excluding fuel and operators — edit them to Roadridge’s own figures. Fleet counts from the company profile.
₹ 0hire-equivalent value idle per month
≈ ₹ 0 a year
Financials

₹ 566 crore in five years

Group turnover by financial year — Roadridge, Sunshine Overseas and the RDPL–SOPL joint venture. Audited by Agarwal Pansari & Co.

Roadridge (RDPL)Sunshine Overseas (SOPL)RDPL–SOPL JV
Leadership

The core team

Sanjay ChokhaniManaging Director
Manohar ChokhaniDirector
Gaurav AgarwalDirector (Technical)Greater Noida, Uttar Pradesh
Deepak SaxenaProject ManagerSairang Pkg-08 site
Kanti DuttaBilling Engineer & QSHead office, Guwahati
Clients & partners
NHIDCLPWD MizoramBorder Roads Organisation — Project VartakBRO — Project SewakDhatarwal Construction Co.Shiwalay Infra Projects
Contact

Talk to us

Phone
+91 88765 69343
Email
contact@roadridge.in
roadridgedevelopers@gmail.com
Web
www.roadridge.in
Corporate office
404, 4th Floor, Narbada Building, Chatribari Main Road, Guwahati 781001, Assam
Sister concern
Sunshine Overseas Pvt. Ltd. (est. 1994) · sunshineoverseas7@gmail.com